Skip to content
TopTel
GPU Servers

Gigabyte Enterprise · GPU Servers

Gigabyte G295-Z43-AP1

HPC/AI Server - AMD EPYC™ 9006 SP8 Server Processors - 2U DP 8 x PCIe Gen6 GPUs (with PCIe switches)

The Gigabyte G295-Z43-AP1 is a model in the G295 family (GPU Servers). As the Turkey authorized distributor of Gigabyte Enterprise, TopTel delivers it with project-specific configuration, local stock and QPS deployment support.

Gigabyte G295-Z43-AP1 GPU Servers

Highlights

  • Supports up to 8 x dual-slot Gen6 GPUs
  • Dual AMD EPYC™ 9006 SP8 Server processors
  • 8-Channel DDR5 RDIMM/MRDIMM per CPU with 16 x DIMMs per node
  • 2 x 10 Gb/s LAN ports via Broadcom® BCM57416
  • 8 x 2.5" Gen5 NVMe/SATA/SAS-4 hot-swap bays
  • 8 x FHFL PCIe x16 slots with Gen6 x16 lanes for GPUs
  • 2 x LP PCIe x16 slots with Gen6 x16 lanes for add-in cards
  • 2 x 3000 W 80 PLUS Titanium redundant power supplies

Technical Specifications

GPUs8
CPU TypeAMD EPYC 9006 SP8
DIMM Slots16
LAN Speed10 Gb/s
LAN Ports2
Drive Bays8 x 2.5"
PSUDual 3000 W
Cooling TypeAir Cooling
ProcessorAMD
CPU SocketSocket SP8
ChipsetAMD® SoC
CategoryGPU Server
ApplicationAI Platform, Visual Computing, High-Performance Computing Server, AI Training Server, AI Inference Server
SeriesG Series
Main Category(For Url)GPU Server
Platformx86 Server
Form Factor2U
CPU SeriesAMD EPYC
CPUs2

Use cases

  • Large language model (LLM) training and fine-tuning
  • AI inference servers (RAG, chatbots, vision)
  • HPC and scientific computing (CFD, molecular dynamics)
  • Render farms and media processing
  • vGPU in VDI environments

Sourcing the G295-Z43-AP1 from TopTel

  • Local stock and fast delivery (Istanbul)
  • Project-specific configuration: memory, disk, GPU, NIC selection
  • Deployment with QPS engineering, BIOS/BMC configuration and commissioning
  • On-site service and RMA management in Turkey
  • Validated with Sangfor HCI as part of the GigaX integrated system

Frequently asked questions

Which GPUs can this model use?

The GPU types listed in the technical table are supported; other GPUs are confirmed against the Gigabyte QVL.

How many kW of power are required?

Fully loaded power draw depends on the PSU capacity; TopTel supports rack planning.

What is the lead time?

In-stock models ship in 1–2 weeks; custom configurations in 4–8 weeks.

Get a quote for the G295-Z43-AP1

We respond within 1 business day with configuration, stock and lead time.

Request a Quote